IPPL Propane Dehydrogenation Radiant Coil Arrangement

2018-10-15

347H Propane Dehydrogenation Project completed using autogenous orbital welding.

 

 

Devon Jackfish 2 Steam Metering Bypass

20” Sch 120 Steam Bypass completed with Electrical resistance preheat and local Post Weld Heat Treat.

 

 

Emerson Venturi

20” Sch 100 A335-P91 Flow Nozzle Meter run. Electrical resistance preheat and local Post Weld Heat Treat.

 

 

Procesco Inc.

A182-316L Stainless Steel Saturation Towers